Contractor

  •  Excavate to design depth, remove soft spots and make good.
  •  Lay concrete edge restraints and allow setting material to harden before commencing laying.
  •  Lay optional geo-textile to prevent migration of material into subgrade.
  •  Lay coarse graded sub-base to required depth, use plate vibrator to ensure compaction during and after.
  •  Place another optional geo-membrane to prevent smaller layer migrating into coarse material.
  •  Add laying course using a levelling screed, place the pavers whilst working.
  •  Use a plate compactor to level.
  •  Brush in jointing material of suitable sized particles.